construction sites events

Laying of the foundation stone of the new Milan Polyclinic

The press conference will be held at 10 am on Wednesday 27th November 2019 and the laying ceremony will follow at 11:30 am on the construction site, in the presence of the President of the Lombardy Region, Attilio Fontana, and the Mayor of Milan, Giuseppe Sala.

[invitation-only event]

The new hospital will be the largest and most modern one in the heart of Milan, a hospital open and accessible not only to patients and their families, but to the whole city. The new Milan Polyclinic is a project by Boeri Studio (S. Boeri, G. Barreca, G. La Varra), which after winning the international design competition in 2007 in ATI with Techint S.p.A., was responsible for the drafting of the architectural design (schematic, final, revision of the final, construction).

Press conference | Aula Magna Clinica Mangiagalli – Via della Commenda 12, Milan – 10.00 am
Marco Giachetti, Presidente Fondazione IRCCS Ca’ Granda Ospedale Maggiore Policlinico
Ezio Belleri, General Manager of Fondazione IRCCS Ca’ Granda Ospedale Maggiore Policlinico
Giuseppe Sala, Mayor of Milan
Attilio Fontana, President of the Lombardy Region
Roberto Speranza, Italian Minister of Health (was invited)

Laying of the foundation stone | Construction site area – Entrance Via della Commenda 16, Milan – 11.30 am

Matterino Dogliani, President of the SIS Consortium, the company in charge of the construction of the New Hospital, will be present.

the poster of the event

the project of the new milan polyclinic

WWW.POLICLINICO.MI.IT